-
-
-
In general, the following steps highlight what is required:
- Ensure that all performance requirements and/or objectives, agreed to with the client, are known and documented.
- Define the test cases that are required for performance testing.
- Gather all information pertinent to volumetric for issues of sizing as well as performance (i.e., estimated file sizes, normal and peak throughput, etc.).
- Create the Performance Test Plan.
- Ensure transaction drivers and other required utilities are developed, tested and configured prior to the commencement of testing.
- Determine the tools and methodologies required to measure the performance.
- Create the Performance Test environment.
- Create and populate the Performance Test database.
- Update all system and application configurations to reflect the test site environment.
- Execute test cases as specified in the Performance Test Plan
- If one or more performance requirements cannot be met, introduce changes to the system configuration and/or corrections to the affected unit(s).
- If the performance requirement(s) in question still cannot be met, complete a Problem Report.
- Once all problems have been resolved, re-run the necessary tests.
- Complete analysis of performance test results and document.
-
-
Leave a Reply
You must be logged in to post a comment.