1.1 Accommodation requirements are established
The site is investigated to establish the environmental factors which will influence the design solution
1.2 Appropriate design precedents are investigated.
1.3 Appropriate building materials and methods are investigated.
1.4 Information regarding the brief, site, materials and methods is communicated.
2.1 All considerations are creatively integrated into the conceptual design solution.
2.2.Conceptual sketches are developed from the routine research and finalized problem statement
Perform site and problem analysis at the basic level.
Development and constraints of the design process are addressed and incorporated in the design.
2.3 Design is finalized and Presented to the client.
3.1 All technological considerations are integrated in the design process.
3.2 Appropriate materials and specifications are selected and incorporated to achieve design and construction objectives.
3.3 Construction drawings and details are produced using appropriate technology.
3.4 All technological service considerations are incorporated in the architectural documentation.
4.1 Preliminary technical information is co-ordinated and distributed to the professional team.
4.2 Site minutes, correspondence and production documentation are distributed to the professional team
4.3 Production documentation is distributed to the contract team.
4.4 Time management principles are demonstrated where applicable
Human resource principles are demonstrated where applicable
Office administrative principles are demonstrated where applicable.
Project and/or office budget principles are demonstrated where applicable.
Capital items are managed where applicable.
Integrated assessment:
Examinations and/or projects and assignments and/or continuous evaluation and/or panel evaluation and/or portfolio presentation and evaluation by Architectural Professionals.