The goal of integration testing is to ensure that all interacting subsystems in a system interface correctly with one another to produce the desired results. Furthermore, in trying to attain this goal, integration tests will ensure that the introduction of one or more subsystems into the system does not have an adverse effect on existing functionality.
An integration test covers the testing of interface points between subsystems. Integration testing is performed once unit testing has been completed for all units contained in the subsystems being tested. Integration Testing Procedures consist of:
- Creating and integration test plan
- Creating test data
- Conducting tests according to the integration test plan
- Reporting and reviewing the results of the test
During this phase, the interaction between subsystems is tested. This includes interfaces through Inter Process Communications (IPC) and files. This phase is performed by an independent test team. This team prepares and executes integration tests, generates problem reports and is responsible for passing the integrated system on to the System Test Team for system testing. The Integration Test team then enters a support mode in which it will test problem reports generated by the System Test team before forwarding code fixes to the System Testing environment.
This phase is sometimes combined with the system test phase as per the client’s
-